In 2026, TOP Server is the OPC server, so reading GE EGD data does not require a second, dedicated OPC server. The question is whether the current TOP Server driver list covers your EGD devices, and you should confirm that before you scope a project.
TL;DR
Yes, in the sense that matters: you install one product, TOP Server, and it plays the OPC server role. Your OPC client connects to TOP Server directly. There is no separate OPC server layered underneath it.
What TOP Server needs is a protocol driver for the device. For GE Ethernet Global Data, that means an EGD driver inside TOP Server. Check the current driver list on the Software Toolbox site or ask sales to confirm support for your exact controllers and firmware in 2026.
The hidden cost in this answer is not a second server. It is the EGD exchange configuration, which has to match what your controllers already produce and consume.
EGD is a producer/consumer protocol. GE controllers publish exchanges over UDP on Ethernet, and any consumer on the network can subscribe. That design is why a connectivity server can listen without polling each controller one request at a time.
The path looks like this:
The tag mapping lives in TOP Server. The client never speaks EGD.
One server sits between the controllers and every OPC client.
TOP Server
EGD device driver
Second OPC server
SCADA platform
GE vendor OPC product
Verdict: TOP Server is the right fit when you want one OPC layer for EGD plus other protocols. Skip it if your only need is a single GE-native screen inside GE software.
The time to get EGD data flowing is driven by a short list of factors:
On a flat network with documented exchanges, expect configuration work, not a development project. Undocumented exchanges are where schedules slip.
Pros
Cons
Often, yes. Many plants run GE Fanuc-era controllers with EGD alongside newer equipment. The workflow for pulling that data into a unified plant view is covered in GE Fanuc PLCs to unified plant data. Treat that as the architecture reference and confirm EGD specifics against the current driver documentation.
If EGD is one of several protocols in a 2026 rollout, plan the full device list up front. Adding drivers mid-project is normal, but it should not surprise your schedule. Timing is covered in how long adding a new PLC driver to TOP Server takes.
Confirm EGD support for your controllers
Send your controller models and firmware; get a driver answer.
Does TOP Server need another OPC server to read GE EGD data?
No. TOP Server is the OPC server. Your OPC client connects to it directly, and the EGD driver handles the device side.
Is EGD a polled protocol?
No. EGD is producer/consumer over UDP. Controllers publish exchanges and consumers subscribe, which is why configuration centers on exchange definitions.
Can I read EGD tags in a client that only speaks OPC UA?
Yes. The client reads TOP Server tags over OPC UA, and the EGD protocol stays hidden behind the driver.
Do I need SCADA software to test EGD data in TOP Server?
No. Any OPC client can read the tags, and TOP Server runs without a SCADA platform installed.
How do I confirm the EGD driver covers my controllers in 2026?
Check the current TOP Server driver list on softwaretoolbox.com or contact sales with your controller models and firmware versions.
Can TOP Server read EGD and other PLC brands in one project?
Yes. One TOP Server instance can host drivers for multiple protocols, which keeps a mixed-brand plant on a single OPC endpoint.
Before anything else, get the exchange list from the controller programmer. Exchange IDs, producer addresses and sizes decide how fast the 2026 rollout goes, not the software install. Cost questions come second; see how much TOP Server costs.